The 4th observing run of the LIGO-Virgo-KAGRA network has officially come to an end. However, before the long commissioning break prior to the 5th observing run, there will be another short observing run called IR1 (Intermediate Run 1). This is currently planned to start in mid-January 2027. In the coming months, we'll also be retiring a large number of glitches from the project, leaving behind ones whose classifications are more uncertain.

Gravity Spy Statistics

Workflows

Neutron Star Mountain (Level 1)

45% completeSubjects retired: 14.971/33.087

Galactic Supernova (Level 2)

20% completeSubjects retired: 7.961/39.552

Binary Neutron Star Merger (Level 3)

9% completeSubjects retired: 7.964/85.111

Neutron Star-Black Hole Merger (Level 4)

0% completeSubjects retired: 34/299.362

Binary Black Hole Merger (Level 5)

0% completeSubjects retired: 112/384.591

Inflationary Gravitational Waves (Level 6)

0% completeSubjects retired: 122/537.241

Gravity Spy 2.0 (Level 1)

0% completeSubjects retired: 0/1.558

Gravity Spy 2.0 (Level 2)

0% completeSubjects retired: 0/14.258

Gravity Spy 2.0 (Level 3)

74% completeSubjects retired: 7.372/9.996

Gravity Spy İstatistikleri

All Time Stats

Gönüllüler0
Sınıflandırmalar0
Project launched 12 Ekim 2016

Active Stats

Her tıklama önemlidir! Bu projeyi tamamlamak ve araştırmacıların önemli sonuçlar üretmesine yardımcı olmak için Gravity Spy topluluğuna katılın.

3%
Tamamlanan yüzde
Sınıflandırmalar0
Konular0
Tamamlanan Konular0