The 4th observing run of the LIGO-Virgo-KAGRA network has officially come to an end. However, before the long commissioning break prior to the 5th observing run, there will be another short observing run called IR1 (Intermediate Run 1). This is currently planned to start in mid-January 2027. In the coming months, we'll also be retiring a large number of glitches from the project, leaving behind ones whose classifications are more uncertain.

Gravity Spy Statistieken

Werkstromen

Neutron Star Mountain (Level 1)

45% voltooidGepensioneerde proefpersonen: 14.971/33.087

Galactic Supernova (Level 2)

20% voltooidGepensioneerde proefpersonen: 7.961/39.552

Binary Neutron Star Merger (Level 3)

9% voltooidGepensioneerde proefpersonen: 7.964/85.111

Neutron Star-Black Hole Merger (Level 4)

0% voltooidGepensioneerde proefpersonen: 34/299.362

Binary Black Hole Merger (Level 5)

0% voltooidGepensioneerde proefpersonen: 112/384.591

Inflationary Gravitational Waves (Level 6)

0% voltooidGepensioneerde proefpersonen: 122/537.241

Gravity Spy 2.0 (Level 1)

0% voltooidGepensioneerde proefpersonen: 0/1.558

Gravity Spy 2.0 (Level 2)

0% voltooidGepensioneerde proefpersonen: 0/14.258

Gravity Spy 2.0 (Level 3)

74% voltooidGepensioneerde proefpersonen: 7.394/9.996

Gravity Spy statistieken

Statistieken aller tijden

Vrijwilligers0
Classificaties0
Project gelanceerd op 12 oktober 2016

Actieve statistieken

Elke klik telt. Word lid van de community van Gravity Spy om dit project te voltooien en onderzoekers te helpen bij het behalen van belangrijke resultaten. Klik op 'Meer statistieken bekijken' voor nog meer statistieken.

3%
Percentage voltooid
Classificaties0
Taken0
Voltooide onderwerpen0