The 4th observing run of the LIGO-Virgo-KAGRA network has officially come to an end. However, before the long commissioning break prior to the 5th observing run, there will be another short observing run called IR1 (Intermediate Run 1). This is currently planned to start in mid-January 2027. In the coming months, we'll also be retiring a large number of glitches from the project, leaving behind ones whose classifications are more uncertain.

Gravity Spy Statistics

Workflows

Neutron Star Mountain (Level 1)

45% completeSubjects retired: 14 971/33 087

Galactic Supernova (Level 2)

20% completeSubjects retired: 7 961/39 552

Binary Neutron Star Merger (Level 3)

9% completeSubjects retired: 7 964/85 111

Neutron Star-Black Hole Merger (Level 4)

0% completeSubjects retired: 34/299 362

Binary Black Hole Merger (Level 5)

0% completeSubjects retired: 112/384 591

Inflationary Gravitational Waves (Level 6)

0% completeSubjects retired: 122/537 241

Gravity Spy 2.0 (Level 1)

0% completeSubjects retired: 0/1 558

Gravity Spy 2.0 (Level 2)

0% completeSubjects retired: 0/14 258

Gravity Spy 2.0 (Level 3)

74% completeSubjects retired: 7 359/9 996

Statistiky Gravity Spy

All Time Stats

Dobrovolníci0
Klasifikace0
Project launched 12. října 2016

Active Stats

Každé kliknutí se počítá! Připojte se k Gravity Spy a pomozte výzkumníkům dosáhnout důležitých výsledků. Kliknutím na "Zobrazit další statistiky" si můžete prohlédnout ještě více statistik.

3%
Procento dokončení
Klasifikace0
Témata0
Dokončené předměty0